BAM Ritchies: Earlswood Embankment, Huyton

 In Case Study, Repair and Structures

 

The electrification of the main Liverpool to Manchester Victoria rail line required the strengthening of a large pedestrian underpass, Bridge 57 in Huyton, Liverpool.

BAM Ritchies Concrete Techniques division was appointed to undertake the complex works by virtue of their in-house capabilities to undertake the various aspects of the designed solution.

The project included:

  • Installation of shear keys
  • Installation of drainage
  • Waterproof Membrane
  • Installation of reinforcement
  • Application of sprayed concrete
  • Facing brickwork
  • Tarmac

For more information, download the full PDF file here.

Recent Posts
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search