Gunform: A21 Panthurst Farm Armco Tunnel Refurbishment completed march 2025

 In Case Study

Gunform International working for Freyssinet Ltd .  Client :National Highways  .Designers : Jacobs

Armco culvert/ Tunnel approximately 80metres long and 5to 6 metres  in diameter

Gunform Carried out :

Cleaning works using high pressure water jetting

Installed new concrete blinding and reinforced concrete invert 120m3

Installed new Ramarch support sections (manufactured by ISS Ltd) and pre rolled steel reinforcement .

This enabled the  new reinforced concrete lining to be free standing within  the Armco Tunnel  with no direct fixings into the Failing structure.

Application of 216m3 of C40/50 Sprayed concrete Lining 170/220mm thick as sprayed finish.

Install new access ramps

Concrete pumping/spraying  distance up to 100metres .

Equipment used:  Reed B20 concrete pump

Concrete supplier: Brett Concrete

Recent Posts
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search