By Emma Simmonds In Case Study, Underground ConstructionPosted March 6, 2019BAM Ritchies: Border Rail TunnelsBAM Ritchies Concrete Techniques spraying and grouting teams undertook four month’s work near Galashiels on the Borders Rail project with BAM Nuttall. READ MORE
By Emma Simmonds In Case Study, Underground ConstructionPosted March 6, 2019BAM Ritchies: Blackwall Tunnel, LondonBAM Ritchies carried out the concrete refurbishment of the Blackwall Tunnel in London tunnel which included application of sprayed concrete. READ MORE
By Emma Simmonds In Case Study, Underground ConstructionPosted March 6, 2019Shotcrete Services Ltd: Wellclose SquareShotcrete Services Ltd provided supply and labour plant and materials to excavate and construct sprayed concrete enlargements within existing tunnel. READ MORE
By Emma Simmonds In Case Study, Underground ConstructionPosted March 6, 2019Shotcrete Services Ltd: Hearn StreetShotcrete Services Ltd provided supply and labour plant and materials to excavate and construct sprayed concrete enlargements within existing tunnel. READ MORE
By Emma Simmonds In Case Study, Underground ConstructionPosted March 6, 2019Normet UK: Crossrail C435The Crossrail Sprayed Concrete Lining (SCL) design at C435 Farringdon Station for all platform tunnels and more was completed by Normet UK. READ MORE
By Emma Simmonds In Case Study, Underground ConstructionPosted March 6, 2019Normet UK: Crossrail C410Normet UK used their Crossrail Sprayed Concrete Lining (SCL) design at C410, for the underground stations at Tottenham Court Road and Bond Street. READ MORE
By Emma Simmonds In Case Study, Underground ConstructionPosted March 4, 2019BAM Ritchies: Corrib TunnelBAM Ritchies used a structural steel start ring to facilitate the positioning of the tunnel boring machine being used to drive the Corrib Tunnel. READ MORE
By Emma Simmonds In Case Study, Underground ConstructionPosted March 1, 2019Shotcrete Services Ltd: Liverpool Street Station Shotcrete Services Ltd constructed a new cable tunnel and shaft and tie into the existing Liverpool St underground station for Vinci's Crossrail project. READ MORE
By Emma Simmonds In Case Study, New ConstructionPosted March 1, 2019Normet UK: Crossrail C310Normet UK completes works on the Crossrail C310 project and were able to supply the contractor with two types of alkali-free set accelerator to test READ MORE
By Emma Simmonds In Case Study, Water Retaining StructuresPosted March 1, 2019BAM Ritchies: Port of Workington Ship StrikeThe Port of Workington appointed BAM Ritchies to undertake the necessary repairs to bring the jetty back to its original condition. READ MORE